How DL Construction Saved 50% in Estimating Time and Boosts Revenue
DL Construction was spending excessive time building estimates manually and formatting proposals for clients. After switching to Eano Pro, the company centralized its estimating workflow, automated scope breakdowns, and standardized pricing. The result: a 50% reduction in estimating time, faster proposal delivery, and increased revenue from improved bid volume and close rates.

Company Name
Demetrio Luna
Location
Ballinger, TX
Work Type
General Contracting
Team Size
5-10
The Challenge
Before implementing Eano Pro, DL Construction relied on spreadsheets and manual proposal formatting.
The process involved:
- Rewriting scopes for every job
- Manually calculating pricing
- Formatting construction estimates for client presentation
- Reviewing numbers repeatedly to avoid mistakes
Estimating became a bottleneck. Proposal turnaround slowed. Opportunities were lost simply because bids weren’t delivered quickly enough.
“We were spending too much time building estimates instead of building projects.”
Why Eano Pro
DL Construction needed a system that could:
✔️ Organize scope line items automatically
✔️ Standardize construction pricing
✔️ Generate professional construction proposals instantly
✔️ Reduce repetitive administrative work
“Eano simplified everything. Once we built out our templates, the time savings were immediate.”
The ability to reuse structured scopes and adjust pricing quickly changed the pace of their preconstruction process.
Favorite Eano Pro Features
🧾 AI Construction Estimating & Scope Automation
Eano Pro’s AI Estimator helps convert rough notes or scope descriptions into structured line items.
“We can plug in the scope and let the system organize it. That alone saves a ton of time.”
This automation reduces errors and speeds up bid preparation.
📊 Centralized Pricing & Templates
DL Construction uses reusable templates to ensure consistent pricing and margin control across jobs.
“You don’t start from scratch every time. You start from a system.”
Standardization improves both accuracy and professionalism.
📄 Professional Proposal Output
Construction proposals generated in Eano are client-ready and consistent in format.
“It looks polished. Clients see that we’re organized.”
Faster turnaround has directly contributed to improved close rates.
Early Results
Since adopting Eano Pro:
- 50% reduction in estimating time
- Faster proposal turnaround
- Higher bid volume
- Increased revenue
- Improved pricing accuracy
“When you respond faster and look more professional, you win more work.”
Experience & Rating
DL Construction reports:
- Strong satisfaction with time savings
- Increased confidence in pricing
- Improved workflow efficiency
“The system pays for itself in the time it saves.”
Looking Ahead
DL Construction plans to expand Eano Pro usage into:
- Full project financial tracking
- Time tracking and payroll integration
- Integrated invoicing and payment workflows
The long-term goal: one connected system from estimate to job completion.
Advice to Other Contractors
“If you’re still estimating manually, you’re wasting time and probably missing opportunities. Speed matters — and Eano gives you that speed.”
Ready to Save 50% on Estimating?
👉 Book a Free Demo with Eano Pro and see how contractors are increasing revenue with faster, smarter estimating.
See how Eano Pro can transform your contracting business.